Screens and menus
Every Manufacturing menu entry and screen: where to find it, what it is for, what its list shows and which permission it needs.
On this page (13)
Manufacturing > ManufacturingManufacturing > PlanningManufacturing > ProductionManufacturing > QualityManufacturing > SubcontractingManufacturing > CostingManufacturing > ReportsManufacturing > ConfigurationBills of Materials > open a BOMRoutes > open a routeManufacturing Orders > open an orderAdministration > ApplicationsInventory / Products > open a product
Manufacturing > Manufacturing
Manufacturing Dashboard
- What it is for
- The app's home: today's production picture and what needs attention
- List: columns and filters
- Tiles: Open MOs, Released, In Progress, Late Orders, Production Today, Material Shortages, Quality Failures, Scrap %, WIP Value*, Production Variance* (*cost.view only). Cards: Production by Status, Late MOs, Capacity Utilization, Work Center Load - Today, Material Shortages, Quality Exceptions, In Production, Running Work Orders, Scrap Trend, Cost Variance*
- Buttons and actions
- New Manufacturing Order; Open links to Orders / Capacity Planning / Shortages / Quality Checks / Shop Floor; click a row to open its order
- Permission needed
- manufacturing.view
Manufacturing Orders
- What it is for
- All manufacturing orders (MO) as a list or as cards
- List: columns and filters
- Tabs with counts: Open, All, Draft, Planned (incl. Firmed), Released, In Progress, Late, Completed, Closed, Cancelled. Columns: MO, Product, Status, Production Qty, Produced, Progress bar, Planned Start, Planned Finish (red when late), Warehouse, Responsible, Source, Priority, shortage / quality flags, Est. Cost*, Actual Cost*. Search by number, source ref, lot
- Buttons and actions
- List / Cards toggle (remembered), New (dialog), open an order
- Permission needed
- manufacturing.view (list); manufacturing.create (New)
Work Orders
- What it is for
- Every operation (work order, WO) of released orders
- List: columns and filters
- Tabs: Open (released / in-progress orders only), Ready, In Progress, Paused, Blocked, Completed, All. Columns: Work order, MO, Operation, Work Center, Product, Planned Start, Planned Finish, Qty, Good, Progress %, Status
- Buttons and actions
- Click a row: opens its MO
- Permission needed
- manufacturing.workorder.view
Shop Floor
- What it is for
- Tablet screen for one work center: its queue and the job in hand
- List: columns and filters
- Work Center picker (remembered), Operator / badge picker (remembered), Scan box (MO no., WO no. or work center code). Queue (up to 50): WO no., operation, status, MO, product, planned start, good/planned. Job: To make, Good so far, Progress, Running/Down since, Instructions, Materials of this operation, Quality Checks
- Buttons and actions
- Start, Pause (choose downtime reason), Resume, Complete (good / rejected / lot), Record Scrap (qty + reason), Open order
- Permission needed
- manufacturing.workorder.view (screen); manufacturing.workorder.execute (buttons); manufacturing.scrap.record (scrap)
Production Calendar
- What it is for
- Month view of orders, holidays, overtime and maintenance blocks
- List: columns and filters
- 6-week month grid Mon-Sun, max 5 events per day (+N more), late orders marked; 'Show work orders' tick
- Buttons and actions
- Previous / Next month, Today, click an order -> opens it, click a block -> Maintenance Blocks
- Permission needed
- manufacturing.view
Manufacturing > Planning
Demand
- What it is for
- What has to be made: open sales orders (read-only) plus forecasts, manual and project demand
- List: columns and filters
- Tabs: Sales Orders, Forecast, Manual, Project. Columns: Reference, Kind, Product, Qty, Due, Customer, Scenario, Status
- Buttons and actions
- New demand (dialog), open a row to edit
- Permission needed
- manufacturing.view (list); manufacturing.plan (save)
MRP
- What it is for
- Run material requirements planning; keep planning parameters per product
- List: columns and filters
- Run card: Scenario, Horizon to, formula text; last run: number, time, Proposals, Production, Purchase, Products netted, Inputs fingerprint, exceptions. Planning parameters list: Product, Policy, Lead time (days), Safety stock, Minimum, Multiple, Supplier
- Buttons and actions
- Run MRP, See planned orders, New parameter, open a parameter
- Permission needed
- manufacturing.view (view); manufacturing.plan (run / save)
Planned Orders
- What it is for
- MRP proposals waiting for a person to firm them
- List: columns and filters
- Tabs: Planned, Review, Firmed, Cancelled, All. Columns: Planned order, Kind (production / purchase / transfer), Product, Qty, Start, Due, Supplier, For (pegging refs), Status, Became (MO or PO), Exception
- Buttons and actions
- Row: Firm, Review (Planned only), Cancel; click a firmed row -> its MO
- Permission needed
- manufacturing.view (list); manufacturing.firm (Firm); manufacturing.plan (Review / Cancel)
Production Schedule
- What it is for
- Gantt timeline of work orders
- List: columns and filters
- From date; Day / Week / Month; group by Work Center / Resource / Product; bars coloured by status, late bars marked
- Buttons and actions
- Click a bar -> opens its MO
- Permission needed
- manufacturing.view
Capacity Planning
- What it is for
- Load against available hours per work center per day
- List: columns and filters
- From date; 7 / 14 / 31 days. Rows: work center, utilisation %; cells 'load h / available h' coloured (over = red, >=85% high), blocked days marked, tooltip lists jobs
- Buttons and actions
- None (read-only)
- Permission needed
- manufacturing.view
Material Shortages
- What it is for
- Every short component on open orders and what to do
- List: columns and filters
- Columns: MO, Component, Required, Available, Short Qty, Expected Receipt (red if after MO start), MO starts, Suggested
- Buttons and actions
- Purchase Request (supplier + qty), Use Substitute, Reschedule MO; click MO -> opens it
- Permission needed
- manufacturing.view; manufacturing.plan (purchase / reschedule); manufacturing.edit (substitute)
Manufacturing > Production
Manufacturing Orders (Production menu)
- What it is for
- Same list and record as Manufacturing > Manufacturing Orders
- List: columns and filters
- As the Manufacturing Orders list
- Buttons and actions
- As the Manufacturing Orders list
- Permission needed
- manufacturing.view
Material Issues
- What it is for
- Every issue, return and backflush of components
- List: columns and filters
- Tabs: All, Issues, Returns, Backflush. Columns: Issue (MI-), MO, Kind, Date, Transfer (Inventory picking no.), Components (code qty (lot)), Value, By
- Buttons and actions
- Click a row -> opens its MO
- Permission needed
- manufacturing.view
Production Receipts
- What it is for
- Finished goods received into stock
- List: columns and filters
- Columns: Receipt (PR-), MO, Product, Date, Good Qty, Rejected, Lot, Warehouse, Value* (cost.view)
- Buttons and actions
- Click a row -> opens its MO
- Permission needed
- manufacturing.view
By-products
- What it is for
- Receipts that brought in by- or co-products
- List: columns and filters
- Receipt columns plus 'By- and co-products' (product qty)
- Buttons and actions
- Click a row -> opens its MO
- Permission needed
- manufacturing.view
Scrap
- What it is for
- Every scrap record, and the ones waiting for approval
- List: columns and filters
- Tabs: All, Waiting approval, Done, Rejected. Columns: Scrap (SC-), MO, Kind, Product, Qty, Reason, Normal / Abnormal, Cost, Status, Date
- Buttons and actions
- Approve / Reject (rows waiting approval)
- Permission needed
- manufacturing.view (list); manufacturing.quality.approve (decide)
Rework
- What it is for
- Rejected quantity sent to rework
- List: columns and filters
- Tabs: All, Requested, In rework, Accepted, Scrapped. Columns: Rework (RW-), MO, Product, Qty, Reason, Rework MO, Accepted, Scrapped, Status
- Buttons and actions
- Rework MO (requested), Accept, Scrap (confirm); click -> rework MO or source MO
- Permission needed
- manufacturing.view (list); manufacturing.create (actions)
Manufacturing > Quality
Quality Checks
- What it is for
- Checks raised by quality plans or added by hand; record their results
- List: columns and filters
- Tabs: Pending, Failed, Hold, Passed, All. Columns: Check (QC-), Name, MO, Point, Operation, Specification, Limits, Result, Status, Inspector, Checked
- Buttons and actions
- Click a row -> Record result dialog; Order button -> opens the MO
- Permission needed
- manufacturing.quality.view (list); manufacturing.quality.record (record); manufacturing.quality.approve (deviation)
Inspection Plans
- What it is for
- Same register as Configuration > Quality Templates
- List: columns and filters
- As Quality Templates
- Buttons and actions
- As Quality Templates
- Permission needed
- manufacturing.quality.view; manufacturing.configure (save)
Non-Conformance
- What it is for
- Non-conformance reports (NCR) with root cause and corrective action
- List: columns and filters
- Tabs: All, Open, Investigating, Corrective action, Closed. Columns: NCR, MO, Product / material, Issue, Severity, Supplier, Owner, Due (red when overdue), Status
- Buttons and actions
- New NCR, open to edit, row: Investigate, Action, Close
- Permission needed
- manufacturing.quality.view; manufacturing.quality.record (save / investigate / action); manufacturing.quality.approve (close)
Rework (Quality menu)
- What it is for
- Same register as Production > Rework
- List: columns and filters
- As Rework
- Buttons and actions
- As Rework
- Permission needed
- manufacturing.quality.view (menu); manufacturing.view (data)
Quality Reports
- What it is for
- The Quality report (pass rate per product and point)
- List: columns and filters
- Product, Point, Checks, Passed, Failed, Pending, Pass rate %
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.quality.view (menu); manufacturing.view (data)
Manufacturing > Subcontracting
Subcontract Orders
- What it is for
- Work a vendor does for an order
- List: columns and filters
- Tabs: All, Draft, Components sent, Vendor production, Partly received, Received. Columns: Subcontract (SUB-), MO, Vendor, Product, Qty, Received, Outstanding, Components (We send / Vendor supplies), Purchase order, Due, Status
- Buttons and actions
- New subcontract order, row: Send components, Purchase order, Receive, Return unused, Close; click -> MO
- Permission needed
- manufacturing.view; manufacturing.edit (create / close); manufacturing.material.issue (send / return); manufacturing.plan (PO); manufacturing.production.register (receive)
Components to Vendor
- What it is for
- Components sitting at each vendor (still company stock)
- List: columns and filters
- Card per vendor: Open orders, Outstanding, Components at vendor value*; table component / qty / value*
- Buttons and actions
- None
- Permission needed
- manufacturing.view
Subcontract Receipts
- What it is for
- Subcontract orders partly or fully received
- List: columns and filters
- Tabs: Partly received, Received, Closed; subcontract columns
- Buttons and actions
- Receive, Return unused, Close (no New)
- Permission needed
- manufacturing.view
Vendor WIP
- What it is for
- Value and quantity at each subcontractor
- List: columns and filters
- As Components to Vendor (cards per vendor)
- Buttons and actions
- None
- Permission needed
- manufacturing.view
Subcontract Cost
- What it is for
- Subcontract orders with their service cost
- List: columns and filters
- Subcontract columns plus Price / unit, Service cost (price x qty), At vendor
- Buttons and actions
- As Subcontract Orders (no New)
- Permission needed
- manufacturing.cost.view (menu)
Manufacturing > Costing
Standard Cost
- What it is for
- Each active BOM rolled up per unit beside the product's cost
- List: columns and filters
- Columns: BOM vN, Product, Material, Labour, Machine, Overhead, Rolled-up / unit, Product cost, Difference (red > 0, green < 0), Hours
- Buttons and actions
- Click a row -> opens the BOM
- Permission needed
- manufacturing.cost.view
Estimated Cost
- What it is for
- Opens the Standard vs Actual Cost report
- List: columns and filters
- MO, Product, Total std, Total actual, Variance
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.cost.view
Actual Cost
- What it is for
- Opens the Standard vs Actual Cost report (same as Estimated Cost)
- List: columns and filters
- As Estimated Cost
- Buttons and actions
- As Estimated Cost
- Permission needed
- manufacturing.cost.view
WIP
- What it is for
- WIP report per order
- List: columns and filters
- MO, Product, Status, Raw material issued, Labour applied, Machine cost, Overhead, Subcontract cost, Completed qty, To finished goods, Remaining WIP
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.cost.view
Variances
- What it is for
- Variance report: variances settled at order close
- List: columns and filters
- Date, MO, Product, Variance, Amount, Worked out from
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.variance.view (menu) - server needs manufacturing.cost.view
Production Cost Analysis
- What it is for
- Opens the Standard vs Actual Cost report (same as Estimated Cost)
- List: columns and filters
- As Estimated Cost
- Buttons and actions
- As Estimated Cost
- Permission needed
- manufacturing.cost.view
Manufacturing > Reports
Manufacturing Order Summary
- What it is for
- Orders created in the period with their quantities and cost
- List: columns and filters
- MO, Product, Status, Planned, Produced, Rejected, Scrapped, Planned finish, Actual finish, Estimated*, Actual*, Variance*
- Buttons and actions
- From / To (default: 1st of the month two months back to today), CSV, Print; click row -> MO
- Permission needed
- manufacturing.view
Production Plan vs Actual
- What it is for
- Quantity and hours against plan, schedule adherence
- List: columns and filters
- MO, Product, Planned qty, Produced, % of plan, Planned h, Actual h, Planned finish, Actual finish, Schedule (On time / Late / Open)
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.view
Material Consumption
- What it is for
- Components issued, returned and consumed
- List: columns and filters
- Component, Required, Issued, Returned, Consumed, Orders, Value
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.cost.view
Work Center Utilization
- What it is for
- Available vs planned vs worked hours
- List: columns and filters
- Work center, Name, Available h, Planned h, Worked h, Planned %, Actual %, Overloaded days
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.view
Production Efficiency
- What it is for
- Yield and labour efficiency per product
- List: columns and filters
- Product, Orders, Good, Rejected, Scrap, Yield %, Standard h, Actual h, Efficiency %
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.view
Scrap report
- What it is for
- Scrap in the period
- List: columns and filters
- Scrap, MO, Kind, Product, Qty, Reason, Normal / abnormal, Work center, Status, Cost, Date
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.cost.view
Quality report
- What it is for
- Checks by product and point
- List: columns and filters
- Product, Point, Checks, Passed, Failed, Pending, Pass rate %
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.view
Downtime
- What it is for
- Downtime stretches by work center and reason
- List: columns and filters
- Work center, Reason, Events, Hours
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.view
Variance report
- What it is for
- Same report as Costing > Variances
- List: columns and filters
- As Variances
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.cost.view
WIP report
- What it is for
- Same report as Costing > WIP
- List: columns and filters
- As WIP
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.cost.view
Production Status and Cost Variance (R048)
- What it is for
- Reconciles each order: opening + cost - output - expense = closing
- List: columns and filters
- MO, Product, Status, Planned, Produced, Scrapped, Material issued, Returned, Labour + machine + overhead, Subcontract, Finished goods, Abnormal scrap, Settled variance, WIP, Reconciles
- Buttons and actions
- From / To, CSV, Print
- Permission needed
- manufacturing.cost.view
Lot Traceability
- What it is for
- Trace a lot backward (what went in) and forward (where it went)
- List: columns and filters
- Lot box; cards Backward / Forward: From (component), Order, To, Qty, Date, Delivered to
- Buttons and actions
- Trace; click a row -> MO
- Permission needed
- manufacturing.view
All Reports
- What it is for
- Catalogue of the 16 reports by group (orders, materials, operations, quality, costing)
- List: columns and filters
- Cost reports are hidden without cost.view
- Buttons and actions
- Click a report -> runs it (incl. Material Shortage, Work Order Performance, Rework, Standard vs Actual Cost which have no own menu)
- Permission needed
- manufacturing.view
Pivot
- What it is for
- Cross-tab of orders
- List: columns and filters
- Rows: Product, MO, Work Center, Operation, Warehouse, Responsible, Project. Columns: Month, Status, Production Profile, Total. Measures: Planned Qty, Produced Qty, Rejected Qty, Hours, Material Cost*, Labor Cost*, Actual Cost*, Variance*; From / To
- Buttons and actions
- Change rows / columns / measure; totals per row and column
- Permission needed
- manufacturing.view (cost measures need manufacturing.cost.view)
Graphs
- What it is for
- Five bar charts
- List: columns and filters
- Production by Month, Plan vs Actual (planned + produced bars), Scrap Trend, Work Center Utilization, Cost Variance Trend*
- Buttons and actions
- Switch graph
- Permission needed
- manufacturing.view (variance trend needs manufacturing.cost.view)
Manufacturing > Configuration
Bills of Materials
- What it is for
- BOM list
- List: columns and filters
- Tabs: Active, Archived. Columns: BOM, Product, Type, Active version (vN), Status, Route, Orders
- Buttons and actions
- New BOM (dialog), open a BOM
- Permission needed
- manufacturing.bom.view; manufacturing.bom.edit (New)
BOM Types
- What it is for
- Fixed list: Manufacture, Phantom / kit, Kit, Subcontract, Formula / batch
- List: columns and filters
- Code, Type (read-only)
- Buttons and actions
- None
- Permission needed
- manufacturing.view
Routes
- What it is for
- Route (routing) list
- List: columns and filters
- Tabs: Active, Archived. Columns: Route, Name, Product, Active version, Operations
- Buttons and actions
- New Route (dialog), open a route
- Permission needed
- manufacturing.route.view; manufacturing.route.edit (New)
Operations
- What it is for
- Standard operations a route line can start from
- List: columns and filters
- Code, Operation, Default work center, Setup (min), Run per unit (min), Cost category, Active
- Buttons and actions
- New, click to edit, Remove
- Permission needed
- manufacturing.view; manufacturing.configure (save)
Work Centers
- What it is for
- Machines / lines / cells with their calendar and rates
- List: columns and filters
- Code, Name, Calendar, Capacity (stations), Efficiency %, Machine rate / h, Labour rate / h, Operators, Status
- Buttons and actions
- New, edit, Remove (used -> archived)
- Permission needed
- manufacturing.view; manufacturing.configure
Resources
- What it is for
- Machines, employees, teams, tools with skills
- List: columns and filters
- Code, Name, Type, Work center, Employee, Rate / h, Status
- Buttons and actions
- New, edit, Remove
- Permission needed
- manufacturing.view; manufacturing.configure
Production Profiles
- What it is for
- Light Assembly, Discrete, Process / Formula, Subcontract, Engineer to Order: which parts of the engine are on
- List: columns and filters
- Code, Profile, What it is for, Order, Active
- Buttons and actions
- New, edit (features ticks), Remove
- Permission needed
- manufacturing.view; manufacturing.configure
Cost Categories
- What it is for
- Cost category list (material, labour, machine, subcontract, overhead, scrap, rework)
- List: columns and filters
- Code, Name, Arabic name, Order, Active
- Buttons and actions
- New, edit, Remove (lists are switched off, never deleted)
- Permission needed
- manufacturing.view; manufacturing.configure
Calendars
- What it is for
- Working days and shifts; seeded 'STD Standard week' Mon-Fri 08:00-17:00, 60 min break
- List: columns and filters
- Code, Calendar, Working days, Active
- Buttons and actions
- New, edit (shifts table), Remove
- Permission needed
- manufacturing.view; manufacturing.configure
Holidays, Overtime and Maintenance
- What it is for
- Holidays, overtime, maintenance and breakdown blocks
- List: columns and filters
- Kind, Calendar, Work center, From, To, Note, Status (newest first)
- Buttons and actions
- New, edit, Remove; after save a banner lists work orders the block lands on
- Permission needed
- manufacturing.view; manufacturing.plan (save)
Quality Templates
- What it is for
- Quality plans: checks raised on operations / finished goods
- List: columns and filters
- Code, Template, Check point, Product, Product category, Sample, Blocks completion, Active
- Buttons and actions
- New, edit (checks table), Remove
- Permission needed
- manufacturing.quality.view; manufacturing.configure
Substitute Components
- What it is for
- Approved alternates for a component
- List: columns and filters
- Substitute group, Primary component, Substitute, Conversion qty, Priority, Approval required, From, To, Active
- Buttons and actions
- New, edit, Remove
- Permission needed
- manufacturing.bom.view; manufacturing.bom.edit AND manufacturing.configure (see Security)
Other Lists
- What it is for
- Scrap reasons, Downtime reasons, Non-conformance types (tabs)
- List: columns and filters
- Code, Name, Arabic name, Order, Active
- Buttons and actions
- New, edit, Remove (switched off)
- Permission needed
- manufacturing.view; manufacturing.configure
Production Settings
- What it is for
- Company rules for production, costing and posting
- List: columns and filters
- Form + Posting accounts (WIP 1250, Applied labour 5250, Applied machine 5255, Applied overhead 5260, Variance 5310, Abnormal scrap 5320, Subcontract accrual 2150)
- Buttons and actions
- Save
- Permission needed
- manufacturing.configure (save); manufacturing.view (read)
Bills of Materials > open a BOM
BOM record
- What it is for
- One BOM with its versions (Draft -> Approved -> Active) and components
- List: columns and filters
- Header: Product, Type, Route, Production profile, Version pills, Effective, Drawn up by / approved by / change note. Tabs: Components (Component, Qty, Scrap %, Operation, Issue method, Substitute group, Phantom, Cost), By-products, Where used. Side: Cost roll-up* (Material, Labour, Machine, Overhead, Per unit, Hours)
- Buttons and actions
- Save version, Approve (draft); Activate, Back to draft (approved); New version (approved / active); More: Deactivate version, Delete draft, Archive / Restore BOM; Smart: Orders, Versions, Where used
- Permission needed
- manufacturing.bom.view; bom.edit (save / new / delete / archive); bom.approve (approve / activate / deactivate / back to draft)
Routes > open a route
Route record
- What it is for
- One route with its versions and operations
- List: columns and filters
- Version pills, drawn up / approved by. Operations: #, Operation, Work Center, Setup min, Run min / unit, Dependency, After #, Quality, Skill, Instructions
- Buttons and actions
- Save version, Approve (draft); Activate (approved); New version; More: Archive / Restore route; Smart: Versions, BOMs
- Permission needed
- route.view; route.edit (save / new); manufacturing.bom.approve (approve / activate)
Manufacturing Orders > open an order
Manufacturing Order record (MO-000125 design)
- What it is for
- One order: stage rail Draft > Planned > Firmed > Released > In Progress > Completed > Closed, pager 'n / N', header, tabs, sidebar
- List: columns and filters
- Header (collapsible), tabs Overview (BOM + Work Orders + Production Summary tiles + 4 notes), Materials, Operations, Work Orders, Quality, By-products, Costs*, Documents, History. Sidebar: Production Progress donut, Related Information (View All), Quick Actions. Footer: Warehouse, Lot, BOM, Route. Late / At risk chips
- Buttons and actions
- By state: Plan, Firm, Release, Start Production, Register Production, Complete Production, Close, Reopen, Save, Cancel; More: Material Issue, Record Scrap, Short-close, Back to draft, Reschedule from now, Duplicate; Print: MO, Finished good / Batch / Serial / WIP / Material labels; Smart buttons; row menus
- Permission needed
- manufacturing.view plus the action's own code
Administration > Applications
Manufacturing app configuration
- What it is for
- Company switches: MRP and planned orders, Quality checks and non-conformance, Subcontracting, Scrap and rework, By-products; field rules: MO Source reference, MO Project, NCR Customer complaint reference, NCR Due date
- List: columns and filters
- Features list with On / Off; Fields list with Normal / Hidden / Required / Read-only
- Buttons and actions
- Change, Preview, Propose; a second admin approves
- Permission needed
- company.manage (two-person approval)
Inventory / Products > open a product
Product record - BoM and Routes
- What it is for
- What Manufacturing says on the product: its BOMs, versions, default BOM, routes, open orders, quality
- List: columns and filters
- BOM rows (code, kind, priority, versions, latest status), routes
- Buttons and actions
- Links into the BOM / route
- Permission needed
- manufacturing.view or manufacturing.bom.view