Manufacturing troubleshooting

The messages you can meet in Manufacturing, what they mean and how to fix them.

Messages and fixes

MessageWhat it meansWhat to do
'Choose the product to make.'The order has no product.Pick a stocked product.
'<code> is not a stocked product - it cannot be made.'The product is a service.Choose a goods product.
'<BOM> has no active version for 10 on 2026-10-02.'No BOM version is live for that quantity and date.Approve and activate a version, or check its dates and quantity range.
'That BOM makes another product.'The chosen BOM belongs to another product.Clear the BOM so the system picks one.
'The order has no BOM, no route and no components - add a BOM or a route for the product, or the components.'Plan has nothing to plan.Create the BOM or route, or use Add Material.
'The order is released: its product, BOM, route and quantity are fixed. Short-close it or make a new order.'You changed a frozen field.Short-close, or create a new order.
'Someone else changed this record. Reload it and try again.'Another user saved first.Reload and re-enter your change.
'Components are short. Buy or transfer them, use a substitute, or release with the partial-start policy.'Not enough free stock to release.Raise a purchase request, use a substitute, or switch on Allow release with short components.
'LG-01: 45 is more than the 40 still needed. Record it as extra use, or change the order.'Issue exceeds requirement plus tolerance.Issue the needed quantity or raise the over-issue tolerance.
'Only 40 of LG-01 is on the order to return.'Return exceeds what was issued.Return a smaller quantity.
'TT-01 is tracked by lot - choose the lot it comes from.'A tracked component was issued without a lot.Choose a lot in the dialog.
'Only 4 is left to produce on this order.'Good quantity exceeds what is left.Register the remainder, or short-close.
'Enter the good or the rejected quantity.'Both quantities are zero.Enter at least one.
'Backflush is short - nothing was posted.'A backflush component lacks stock and all-or-nothing is on.Receive stock, or switch off Backflush all or nothing.
'Cutting (WO-...) has to finish first.'The operation depends on an unfinished one.Complete the earlier operation.
'Record the quality checks of this operation first: <check name>'A blocking check is open.Record its result.
'The person who drew up a BOM version does not approve it - ask another engineer (segregation of duties).'You are approving your own work.Ask another engineer with approve permission.
'This BOM already has a draft version - finish that one first.'Only one draft is allowed.Approve or delete the current draft.
'The inspector who failed the check does not approve its deviation.'Same person tried to approve.A different quality approver decides.
'The person who recorded the scrap does not approve it.'Same person tried to approve scrap.Another approver decides.
'A scrap record is waiting for approval.'Close is blocked.Approve or reject the scrap.
'1 non-conformance report(s) are still open on this order.'Close is blocked.Close the NCR.
'Record the root cause and the corrective action before closing.'NCR closed without both.Fill them in, then Close.
'Material has been issued to this order. Return it to the warehouse before cancelling.'Cancel with issued stock.Return the material first.
'Goods have been produced; short-close the order instead.'Cancel with output.Use Short-close.
'Components are still at the vendor - return them first.'Closing a subcontract order too early.Use Return unused, then Close.
'MRP and planned orders is disabled for this company.'The feature switch is off.Ask an administrator to switch it on.