Field reference

Every field on every Manufacturing form: label in English and Arabic, type, whether it is required, its limits, a valid example and what the system refuses.

On this page (48)
New Manufacturing Order / MO headerMO headerMO > Overview > notesMO > Overview > Add MaterialMO > Add Work OrderMO > Material Issue / Return Material dialogMO > Material Issue dialogMO > Register Production dialogMO > Record Scrap dialogMO > Short-close dialogMO > Work order > BlockMO > Work order > Complete dialogMO > Quality Check (add)Quality Checks / MO > Record resultNon-Conformance > New / edit NCRDemand > New demandMRP > Run MRPMRP > Planning parameterMaterial Shortages > Purchase RequestBills of Materials > New BOMBills of Materials > New BOM / BOM recordBOM record > Components (draft version)BOM record > New versionBOM version (API only - no screen)Routes > New RouteRoute record > Operations (draft)Work CentersResourcesOperationsProduction ProfilesCalendarsMaintenance BlocksQuality TemplatesSubstitute ComponentsCost Categories / Other ListsProduction SettingsProduction Settings > Posting accountsSubcontract Orders > New subcontract orderSubcontract Orders > ReceiveShop FloorShop Floor > CompleteShop Floor > Pause / Record ScrapAny reportLot TraceabilityMO > DocumentsMO > HistoryApplications > Manufacturing > FeaturesApplications > Manufacturing > Fields

New Manufacturing Order / MO header

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
ProductالمنتجSelect (product)YesActive products of this company; must be a stocked product (kind goods). Changing it clears BOM and route unless sent. Fixed after releaseOT-1000 Office TableA service product -> '<code> is not a stocked product - it cannot be made.'; none -> 'Choose the product to make.'
Production Qtyكمية الإنتاجNumberYesMore than zero; fixed after release ('The order is released: its product, BOM, route and quantity are fixed. Short-close it or make a new order.')1100 -> 'Must be more than zero.'; 'abc' -> 'Enter a number.'
BOM (empty: the product's active BOM)قائمة الموادSelect (BOM)ConditionalHeader list shows only BOMs of the chosen product. Empty = first active BOM by priority whose version is live today for this qty (min/max qty, effective dates). An order needs a BOM, a route or added components before PlanBOM-OT-1000A BOM of another product (API) -> 'That BOM makes another product.'; BOM with no live version -> '<BOM> has no active version for 10 on 2026-10-02.'
WarehouseالمستودعSelect (warehouse)YesActive warehouses of the company; empty = settings default warehouse, then the company default. Sets the production location <WH>/PROD (made automatically). Fixed after releaseProduction Settings > Default warehouseMAIN - Main WarehouseWarehouse of another company (API) -> 'Choose a warehouse of this company.'; company without warehouse -> 'Set up a warehouse in Inventory first - production issues and receives through it.'
Planned Startالبدء المخططDate and timeNoEmpty = next working moment on the company calendar. Saving reschedules the work orders forward from it. Editable until the order is completed05/10/2026 08:00 (Dubai)
PriorityالأولويةSelectNoLow / Normal / High / UrgentNormalHigh'top' (API) -> 'Choose one of: Low, Normal, High, Urgent.'
SourceالمصدرSelectNoSales Order, Forecast, Reorder Rule, MRP, Project, Manual, Subcontract, Rework; fixed after release ('The order is released; its source is fixed.')ManualSales Order
Source reference (e.g. SO-000487)مرجع المصدرTextConditionalMax 60. With Source = Sales Order it must be the number of a confirmed / delivered / posted sales order of this company (linked). Company field rule can hide or require itSO-000487 (a confirmed test SO)'SO-999999' -> 'No sales order has that number.'; a draft SO -> 'SO-000488 is not confirmed yet.'
ProjectالمشروعSelect (project)ConditionalCompany projects; company field rule can hide / require / make read-only. Feeds the project dimension on journalsPRJ-0001Required by field rule and empty -> 'Manufacturing order project is required by this company before this step.'
ResponsibleالمسؤولSelect (user)NoActive members of the companyThe creatorA test planner

MO header

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
RouteالمسارSelect (route)NoEmpty = BOM version's route, else BOM's route, else the product's own route. Chosen route must have an active versionRT-OT-1000A route without active version -> 'That route has no active version.'
Planned Finishالانتهاء المخططDate and timeNoTyped finish is a promise: the schedule keeps it, and if the work does not fit the 'At risk' chip shows (tooltip 'The work needs until ...'); must not be before Planned Start07/10/2026 17:00Before Planned Start -> 'The order finishes before it starts.'
MO Dateتاريخ الأمرDateYesCompany's local (Dubai) date; decides which BOM / route version is live. Editable only while Draft / Planned / FirmedToday (Dubai)02/10/2026'2026-13-01' -> 'Enter a date as YYYY-MM-DD.'; cleared -> 'Choose a date.'
Production Locationموقع الإنتاجRead-only-<warehouse>/PROD, usage production (not counted as stock)MAIN/PROD

MO > Overview > notes

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Manufacturing Note / Shop Floor Instruction / Quality Note / Internal Noteملاحظة التصنيع / تعليمات أرض المصنع / ملاحظة الجودة / ملاحظة داخليةText areaNoMax 5000 each; Shop Floor Instruction is shown on the Shop Floor when the operation has noneUse the jig J-12

MO > Overview > Add Material

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
ComponentالمكونSelect (product)YesA company product, not the order's own product; only while Draft / Planned / Firmed; kept when the BOM is re-readGL-01 GlueThe order's product -> 'An order does not consume its own product.'; none -> 'Choose the component.'
QtyالكميةNumberYesMore than zero20 -> 'Must be more than zero.'
Issue methodطريقة الصرفSelectNoManual issue, Preflush (issued at release), Backflush (issued at production), Automatic, Operation-basedManual issueBackflush'push' (API) -> 'Choose one of: Manual issue, Preflush, Backflush, Automatic, Operation-based.'
DescriptionالوصفTextNoMax 200Extra glue for repair

MO > Add Work Order

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
OperationالعمليةTextYesMax 120; only on an open orderPolishingEmpty -> 'Name the operation.'; on a completed order -> 'A finished order takes no more operations.'
Work Centerمركز العملSelectYesA work center of this company (not archived)POL - PolishingEmpty -> 'Choose the work center.'
Setup (min)الإعداد (دقيقة)NumberNo0 or more010-5 -> 'Must be at least 0.'
Run per unit (min)التشغيل لكل وحدةNumberNo0 or more; multiplied by the order quantity03 (x 10 = 30 min)-1 -> 'Must be at least 0.'
InstructionsالتعليماتText areaNoMax 3000Polish edges only

MO > Material Issue / Return Material dialog

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Qty (per component)الكميةNumberYesIssue: at most required x (1 + over-issue %) - already issued (net); default = to issue. Return: at most issued - returned. 0 lines are skipped. Only on Released / In Progress / Completed orders; non-stock lines are not listed40 legsIssue 45 of 40 (over-issue 0 %) -> 'LG-01: 45 is more than the 40 still needed. Record it as extra use, or change the order.'; return 50 of 40 -> 'Only 40 of LG-01 is on the order to return.'; all 0 -> 'Enter the quantities to issue.'

MO > Material Issue dialog

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
LotالدفعةSelect (lot, free qty)ConditionalShown for lot / serial tracked components; lots of the component in the order's warehouse stock location, earliest expiry firstLOT-TT-0925 (30)Tracked component without lot -> 'TT-01 is tracked by lot - choose the lot it comes from.'

MO > Register Production dialog

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Good Qtyالكمية السليمةNumberYes0 or more; at most what is left (qty - produced - scrapped); good or rejected must be > 0; whole units for serial products. Order must be Released / In ProgressRemaining qty411 on a 10-unit order -> 'Only 10 is left to produce on this order.'; 0 good and 0 rejected -> 'Enter the good or the rejected quantity.'
Rejected Qtyالكمية المرفوضةNumberNo0 or more; adds to the order's rejected qty01-1 -> 'Must be at least 0.'
Lot / BatchالدفعةTextConditionalMax 60; for a lot-tracked product empty = the MO number; the lot is created in InventoryThe order's lot (MO number at release)MO-000125
Send rejected to reworkإرسال المرفوض لإعادة التصنيعCheckboxNoTicked: a Rework request (RW-) is made for the rejected qtyOffOn
OperatorالمشغلSelect (employee)NoActive HR employeesEMP-0007 Test Operator
NoteملاحظةTextNoMax 300First batch

MO > Record Scrap dialog

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
KindالنوعSelectYesMaterial scrap (an issued component), Process scrap, Finished goods scrap. Order must be Released / In Progress / CompletedProcess scrapFinished goods scrapOn a draft order -> 'Scrap is recorded on a running order.'
Component (material scrap)المكونSelect (order line)ConditionalRequired for Material scrap; qty at most issued - returned - already scrappedLG-01None -> 'Choose the component that was scrapped.'; 50 of 40 issued -> 'Only 40 of it was issued to the order.'
QtyالكميةNumberYesMore than zero; above Production Settings 'Scrap above this quantity needs approval' it waits for approval10 -> 'Must be more than zero.'
ReasonالسببSelectYesScrap reasons list (DAMAGE, SETUP, DEFECT, MACHINE, OPERATOR, EXPIRED + own)DEFECT Material defectEmpty -> 'Choose the reason.'
Normal scrap (stays in product cost)هالك طبيعيCheckboxNoNormal: value stays in WIP (good units carry it). Abnormal: value leaves WIP to Abnormal scrap expense 5320OnOff (abnormal)
NoteملاحظةTextNoMax 300Dropped on floor

MO > Short-close dialog

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Why it closes shortسبب الإقفال الجزئيText areaYesMax 300; only Released / In Progress orders with produced < plannedCustomer reduced the order to 8Empty -> 'Say why the order closes short.'

MO > Work order > Block

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Why is it blocked?سبب الحظر؟Text (prompt)YesMax 300; cancelling the prompt does nothingMachine guard missing

MO > Work order > Complete dialog

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Good Qtyالكمية السليمةNumberNo0 or more; empty = planned - good - rejected. On the LAST operation the good qty is registered as production (up to what is left)Planned - done10-2 -> 'Must be at least 0.'
Rejected Qtyالكمية المرفوضةNumberNo0 or more00
Minutes worked (leave empty to use the clock)الدقائقNumberNo0 or more; replaces the clock time of the open stretch; costed at the WO's frozen rates150-10 -> 'Must be at least 0.'
LotالدفعةTextNoUsed when this is the last operationMO-000125
Send rejected to reworkإرسال المرفوض لإعادة التصنيعCheckboxNoMakes a rework request for the rejected qtyOff

MO > Quality Check (add)

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
From templateمن قالبSelect (quality plan)ConditionalActive quality templates; chosen = one check per template line. Either a template or a Check nameQP-TABLE Final table check
CheckالفحصTextConditionalMax 160; required when no templateTop flatnessNo template and no name -> 'Name the check.'
TypeالنوعSelectNoPass / fail, Measure, TextPass / failMeasure
SpecificationالمواصفةTextNoMax 200Height 75 cm +/- 0.5
Lower limit / Upper limitالحد الأدنى / الحد الأعلىNumberNoA measured value outside fails on its own74.5 / 75.5'x' -> 'Enter a number.'
UOMالوحدةTextNoMax 20cm
OperationالعمليةSelect (WO of this order)NoA work order of this order; a blocking check on it stops that WO completingWO-000002 AssemblyWO of another order (API) -> 'That work order is not on this order.'
Blocks completionيمنع الإتمامCheckboxNoPending / failed / held blocking checks stop completion when the setting requires itOn

Quality Checks / MO > Record result

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Measured valueالقيمة المقاسةNumberConditionalRequired for a Measure check when Result = 'From the measurement'; inside limits -> Pass, outside -> Fail75.2Empty with 'From the measurement' -> 'Enter the measured value.'; 76 with Result Pass (limits 74.5-75.5) -> '76 is outside 74.5 - 75.5; it cannot pass.'
ResultالنتيجةSelectYesFrom the measurement, Pass, Fail, Conditional pass, Hold, Rework, Scrap, Deviation approval. Deviation needs manufacturing.quality.approve, only on a Fail / Hold check, and not by the inspector who failed itPass (Measure: From the measurement)PassDeviation on a pending check -> 'A deviation is approved for a failed or held check.'; by the same inspector -> 'The inspector who failed the check does not approve its deviation.'
Qty failedالكمية الفاشلةNumberNo0 or more; with Result Rework and qty > 0 a rework request is made2-1 -> 'Must be at least 0.'
Raise a non-conformanceإنشاء تقرير عدم مطابقةCheckboxNoOnly acts when the result is Fail: makes an NCR (severity Major) linked to the checkOffOn
NotesملاحظاتText areaNoMax 3000 (deviation note max 1000)Measured with caliper C-3

Non-Conformance > New / edit NCR

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
IssueالمشكلةText areaYesMax 5000Table legs wobbleEmpty -> 'Describe the issue.'
TypeالنوعSelectNoNCR types list: Material, Process, Supplier, Customer complaint, Machine (+ own)Process
SeverityالخطورةSelectNoMinor / Major / CriticalMinorMajor'high' (API) -> 'Choose one of: Minor, Major, Critical.'
OrderالأمرText (internal order id)NoA free text box that expects the order's internal id, not the MO number; an NCR linked to an order blocks that order's Close until it is closed(leave empty or paste the MO id)
Product / materialالمنتجSelect (product)NoCompany productsLG-01 Leg
SupplierالموردSelect (partner)NoCompany partnersTest Supplier LLC
Machine / work centerمركز العملSelectNoCompany work centersASM - Assembly
OperatorالمشغلSelect (employee)NoActive employeesEMP-0007
Customer complaintشكوى العميلTextConditionalMax 60; company field rule can hide or require itCC-2026-014Required by field rule and empty -> 'Customer complaint reference is required by this company before this step.'
QtyالكميةNumberNo0 or more3-1 -> 'Must be at least 0.'
Root causeالسبب الجذريText areaConditionalMax 5000; required before CloseWrong screw length
Corrective actionالإجراء التصحيحيText areaConditionalMax 5000; required before CloseChanged screw spec to 30 mmClose without root cause / action -> 'Record the root cause and the corrective action before closing.'
OwnerالمسؤولSelect (user)NoCompany membersThe creatorTest QA lead
Due dateتاريخ الاستحقاقDateConditionalOverdue (before today and not closed) shows red; field rule can hide / require15/10/2026'15-10-2026' -> 'Enter a date as YYYY-MM-DD.'

Demand > New demand

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
KindالنوعSelectYesForecast / Manual / Project (sales demand comes from confirmed sales orders)ForecastForecast'sale' (API) -> 'Choose one of: Forecast, Manual, Project.'
ProductالمنتجSelect (product)YesCompany productOT-1000Empty -> 'Choose the product.'
QtyالكميةNumberYesMore than zero300 -> 'Must be more than zero.'
Due dateتاريخ الاستحقاقDateYesOnly demand due up to the MRP horizon is planned30/10/2026Empty -> 'Choose a date.'
WarehouseالمستودعSelectNoCompany warehousesMAIN
ProjectالمشروعSelectNoCompany projectsPRJ-0001
CustomerالعميلSelect (partner)NoCompany partnersTest Customer Dubai
ScenarioالسيناريوTextNoMax 30; MRP plans one scenario at a timebasebase
NoteملاحظةTextNoMax 300Q4 forecast

MRP > Run MRP

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
ScenarioالسيناريوTextNoMax 30; empty = base. Replaces the unfirmed proposals of that scenario onlybasebase
Horizon toحتى تاريخDateNoEmpty = today + MRP horizon (settings, default 60 days)31/12/2026'31/12/26' (API) -> 'Enter a date as YYYY-MM-DD.'

MRP > Planning parameter

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
ProductالمنتجSelectYesOne parameter per product + warehouse (saving the same pair updates it)LG-01Empty -> 'Choose the product.'
WarehouseالمستودعSelectNoEmpty = any warehouse (used after a warehouse-specific one)MAIN
PolicyالسياسةSelectNoMake to stock, Make to order, Buy, Transfer. Production only when the product has a BOM and policy is MTS / MTOMake to stockBuy'kanban' (API) -> 'Choose one of: Make to stock, Make to order, Buy, Transfer.'
Lead time (days)مدة التوريدWhole numberNoNegative becomes 0; start = due - lead time (moved to today with an 'expedite' exception if in the past)13
Safety stockمخزون الأمانNumberNo0 or more; Inventory reorder minimum is used when higher3-1 -> 'Must be at least 0.'
Minimum lotأقل كميةNumberNo0 or more; proposals are raised to it10-5 -> 'Must be at least 0.'
Lot multipleمضاعف الكميةNumberNo0 or more; proposals rounded up to a multiple5
SupplierالموردSelect (partner)NoA purchase proposal without supplier goes to ReviewTest Supplier LLC
ActiveنشطCheckboxNoInactive parameters are ignoredOn

Material Shortages > Purchase Request

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
SupplierالموردSelect (partner)YesMakes a draft purchase order at the product's cost and a firmed planned order pegged to the MOTest Supplier LLCEmpty -> 'Choose the supplier.'
QtyالكميةNumberYesMore than zeroShort qty150 -> 'Must be more than zero.'

Bills of Materials > New BOM

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Product it makesالمنتجSelect (product)YesCompany product; cannot change once orders use the BOMOT-1000Empty -> 'Choose the product this BOM makes.'; change product of a used BOM -> 'Orders use this BOM; make a new BOM for another product.'
Code (empty: BOM-<product>)الرمزTextNoMax 40, upper-cased, unique in the company; empty = BOM-<product code> (then -2, -3...)BOM-OT-1000An existing code -> 'Another BOM already uses this code.'
NameالاسمTextNoMax 160Office table standard
TypeالنوعSelectNoManufacture, Phantom / kit, Kit, Subcontract, Formula / batch; 'Kit' BOMs are never picked for orders; a Phantom BOM explodes into its parent's componentsManufactureManufacture'assembly' (API) -> 'Choose one of: Manufacture, Phantom / kit, Kit, Subcontract, Formula / batch.'

Bills of Materials > New BOM / BOM record

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
RouteالمسارSelectNoCompany routes; changes save immediately on the recordRT-OT-1000
Production profileملف الإنتاجSelectNoProfile decides which features (routes, quality, by-products...) apply to ordersSettings default (Discrete)Discrete Manufacturing

BOM record > Components (draft version)

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
ComponentالمكونSelect (product)YesCompany product, not the BOM's own product; no loop through other live BOMs (checked at Approve)TT-01 Table topThe BOM's product -> 'OT-1000 cannot be a component of itself.'; none -> 'Choose a component.'
QtyالكميةNumberYesMore than zero, per the version's output qty (default 1)14 (legs)0 -> 'Must be more than zero.'
Scrap %الهالك %NumberNo0 to under 100; order qty = qty x order qty x (1 + scrap %)05100 -> 'Scrap is under 100%.'; -1 -> 'Must be at least 0.'
OperationالعمليةWhole numberNoRoute operation sequence where it is used (shop floor shows it at that operation)20
Issue methodطريقة الصرفSelectNoManual, Preflush, Backflush, Automatic, Operation-basedManual issueBackflush (screws)
Substitute groupمجموعة البدائلTextNoMax 30; links to Substitute Components of the same groupLEGS
PhantomوهميCheckboxNoTicked: the component's own BOM is exploded into this order (max 12 levels)Off13 nested phantom levels -> 'The BOM is nested more than twelve levels deep.'

BOM record > New version

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
What changes in the new version?ما التغيير في الإصدار الجديد؟Text (prompt)NoMax 500; copies the shown version as the next draft; only one draft at a timeLegs changed to LG-02A draft already exists -> 'This BOM already has a draft version - finish that one first.'

BOM version (API only - no screen)

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Effective from / to, Min / Max qty, Output qty, Yield %, By-productsالسريان / الكميات / الإنتاج / العائد / المنتجات الثانويةDate / Number / linesNoServer: to >= from; max >= min; output > 0; yield > 0 and <= 100; by-product shares total < 100%. The screen cannot edit theseYield 95Yield 120 -> 'Yield is at most 100%.'; shares 60 + 50 -> 'By- and co-products together take less than 100% of the cost; the main product keeps the rest.'

Routes > New Route

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
CodeالرمزTextYesMax 40, upper-cased, uniqueRT-OT-1000Empty -> 'Give the route a code.'; duplicate -> 'Another route already uses this code.'
NameالاسمTextNoMax 160Table routing
ProductالمنتجSelectNoAn order with no BOM route uses the product's own routeOT-1000

Route record > Operations (draft)

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
# (Sequence)التسلسلWhole numberYesPositive and unique within the version; new line = (lines + 1) x 1010, 20...10Two lines with 10 -> 'Each operation has its own positive sequence.'
OperationالعمليةTextYesMax 120CuttingEmpty -> 'Name the operation.'
Work Centerمركز العملSelectYesCompany work centerCUT - CuttingEmpty -> 'Choose the work center.'
Setup min / Run min / unitإعداد / تشغيل لكل وحدةNumberNo0 or more; WO minutes = (setup + run x qty) / (efficiency % / 100)030 / 12-1 -> 'Must be at least 0.'
DependencyالاعتمادSelectNoFS (finish to start), SS, FF, SFFSFS
After #بعدWhole numberNoSequence of another operation of this version; empty = the previous one10Its own sequence or 99 -> 'An operation depends on another operation of this route.'
QualityالجودةSelect (quality plan)NoPlan of this company; raises its checks on the WO at releaseQP-CUT
SkillالمهارةTextNoSaved as an employee resource with this skill; a WO resource must hold it (not expired) at releaseWelding L2
InstructionsالتعليماتTextNoMax 5000; shown on the Shop FloorCut to 120 x 60 cm

Work Centers

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Code / Nameالرمز / الاسمTextYesCode upper-cased, spaces -> _, unique; name max 200CUT / CuttingEmpty -> 'Code is required.'; existing code -> 'Another record already uses this code.'
CalendarالتقويمSelectNoEmpty = settings default calendarSTD Standard week
Capacity (stations)الطاقة (محطات)NumberNo0 or empty becomes 1; daily available = calendar minutes x capacity x efficiency12-1 -> 'Enter zero or more.'
Efficiency %الكفاءة %NumberNo0 / empty becomes 100; planned minutes divided by it10080
Machine rate / h, Labour rate / h, Setup rate / h, Overhead rate / hأجر الآلة / العمالة / الإعداد / المصاريف غير المباشرة للساعةMoney (AED)No0 or more; empty labour rate = Production Settings labour rate (AED 45); rates are frozen on the work order30 / 45 / 0 / 0-10 -> 'Enter zero or more.'
OperatorsالمشغلونWhole numberNoLabour cost x operators; empty = 1121.5 -> 'Enter a whole number.'
Queue time (min) / Location / Branch / Arabic name / Notesوقت الانتظار / الموقع / الفرع / الاسم العربي / ملاحظاتNumber / Select / TextNoQueue minutes are added to each WO's schedule15
StatusالحالةSelectYesActive / Down / Archived; archived centers leave pickers, Shop Floor and capacityActiveDown

Resources

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Code / Name / Typeالرمز / الاسم / النوعText / SelectYesType: Machine, Employee, Team, Tool, Room, EquipmentR-WELD1 / Welder 1 / EmployeeNo type -> 'Type is required.'
Work center / Employee / Rate / hمركز العمل / الموظف / الأجر للساعةSelect / MoneyNoRate 0 or moreCUT / EMP-0007 / 40
Skills (skill, expiry)المهارات (المهارة، الانتهاء)JSONNoList like [{"skill": "Welding L2", "expires": "2027-01-31"}][{"skill":"Welding L2","expires":"2027-01-31"}]'Welding' (not JSON) -> 'Enter valid JSON.'
StatusالحالةSelectYesActive / Unavailable / Archived; a WO on a non-active resource cannot be releasedActive

Operations

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Code / Operationالرمز / العمليةTextYesUnique codeOP-CUT / Cutting
Default work center / Setup (min) / Run per unit (min) / Cost category / Instructions / Activeمركز العمل الافتراضي / الإعداد / التشغيل / فئة التكلفة / التعليمات / نشطSelect / Number / TextNoMinutes 0 or moreCUT / 30 / 12 / Labour

Production Profiles

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Code / Profileالرمز / الملفTextYesSeeded: LIGHT, DISCRETE, PROCESS, SUBCONTRACT, ETODISCRETE
FeaturesالميزاتCheckboxesNoRoutes and operations, Work orders, Quality, By-products and co-products, Subcontracting, Lot / batch control, Costing, Project costing, Change control, Yield. Off: the MO hides that tab; quality off = no checks raised; by-products off = none receivedTick Quality
What it is for / Arabic name / Order / Activeالغرض / الاسم العربي / الترتيب / نشطText / NumberNo-Discrete manufacturing

Calendars

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Code / Calendarالرمز / التقويمTextYesUnique code2SHIFT / Two shifts
Working daysأيام العملWeekday ticksNoMon..Sun (0 = Monday); new calendar default Mon-FriMon-FriMon-Sat
Shifts (Shift, Start, End, Break)الورديات (الوردية، البدء، الانتهاء، الاستراحة)TableNoTimes HH:MM in company (Dubai) time; end <= start = night shift; break minutes are taken off the lengthDay 08:00 17:00 60'8:00' -> 'Shift times are HH:MM.'

Maintenance Blocks

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
KindالنوعSelectYesHoliday, Overtime, Maintenance block, Breakdown; overtime adds working time, the others remove itMaintenance blockEmpty -> 'Kind is required.'
Calendar / Work centerالتقويم / مركز العملSelectConditionalOne of them required unless Holiday (a holiday with neither applies company-wide)Work center CUTMaintenance with neither -> 'Choose the calendar or the work center it applies to.'
From / Toمن / إلىDate and timeYesTo after From; hours computed06/10/2026 08:00 - 12:00To before From -> 'The block ends before it starts.'; empty -> 'From is required.'
Note / Statusملاحظة / الحالةText / SelectNoStatus Planned, Active, Done, Cancelled (daily clock moves planned -> active -> done); cancelled blocks are ignoredPlannedPM service

Quality Templates

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Code / Template / Check pointالرمز / القالب / نقطة الفحصText / SelectYesPoint: Incoming, Before operation, During operation, After operation, Final. Final plans for the product or its category are raised on every released order; Incoming on subcontract receiptsQP-TABLE / Final table check / Final
Product / Product category / Operation code / Sample / Blocks completion / Activeالمنتج / فئة المنتج / رمز العملية / العينة / يمنع الإتمام / نشطSelect / Text / Number / CheckboxNoSample = qty checkedBlocks completion OnOT-1000 / - / - / 1
Checks (Check, kind, Specification, Lower, Upper, UOM)الفحوصTableNoKind pass_fail / measure / text (other text -> pass_fail); lines without a name are droppedHeight | measure | 75 cm | 74.5 | 75.5 | cmLower 76, Upper 75 -> 'The upper limit is below the lower.'

Substitute Components

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Substitute group / Primary component / Substituteمجموعة البدائل / المكون الأساسي / البديلText / SelectYesSubstitute must differ from the primaryLEGS / LG-01 / LG-02Same product twice -> 'A component is not its own substitute.'
Conversion qty / Priority / Approval required / From / To / Activeكمية التحويل / الأولوية / يتطلب اعتمادًا / من / إلى / نشطNumber / Checkbox / DateNoRatio empty = 1 (substitute qty = moved qty x ratio); priority empty = 10; Approval required -> using it needs manufacturing.bom.approve1 / 101.25 / 10 / On

Cost Categories / Other Lists

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Code / Nameالرمز / الاسمTextYesUnique within the listPAINT / Paint defectExisting code -> 'Another record already uses this code.'
Arabic name / Order / Active / Account (code, cost categories only)الاسم العربي / الترتيب / نشط / الحسابText / Number / CheckboxNoInactive entries leave the pickersعيب طلاء / 70 / On

Production Settings

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Default production profile / Default warehouse / Default calendarملف الإنتاج الافتراضي / المستودع الافتراضي / التقويم الافتراضيSelectNoSeeded: Discrete Manufacturing, company default warehouse, STD Standard weekDiscrete / MAIN / STD
Overhead on material, labour and machine %نسبة المصاريف غير المباشرة %NumberNo0 to 5001010600 -> 'At most 500.'; -1 -> 'Must be at least 0.'
Labour rate per hour (where a work center has none)أجر العمالة للساعةMoney (AED)No0 to 10000045.0045.00200000 -> 'At most 100000.'
Reserve components at releaseحجز المكونات عند الإطلاقCheckboxNoRelease reserves each stocked component in InventoryOn
Allow release with short componentsالسماح بالإطلاق مع نقصCheckboxNoOff: release is refused when a component is shortOff
Over-issue tolerance %هامش الصرف الزائد %NumberNo0 to 10005 (40 legs -> up to 42)150 -> 'At most 100.'
Backflush all or nothingصرف تلقائي كامل أو لا شيءCheckboxNoOn: a short backflush refuses the whole registration; Off: takes what there isOn
Quality checks must pass to completeيجب اجتياز الفحوص للإتمامCheckboxNoBlocking checks Pending / Fail / Hold stop CompleteOn
A BOM is approved by someone other than its authorاعتماد القائمة من شخص آخرCheckboxNoApplies to BOM and route versionsOn
Scrap above this quantity needs approval (0 = never)الهالك فوق هذه الكمية يحتاج اعتمادًاNumberNo0 or more05-1 -> 'Must be at least 0.'
Hide smart buttons with nothing in themإخفاء الأزرار الفارغةCheckboxNoMO smart buttons with 0 are hiddenOff
MRP horizon (days)أفق التخطيط (أيام)Whole numberNo7 to 73060905 -> 'Between 7 and 730.'; '9.5' -> 'Enter a whole number.'
Post production costs to the ledger (WIP)ترحيل تكاليف الإنتاج إلى الأستاذCheckboxNoOn: every cost row posts a journal; turning it on creates the default accounts in the chart if missing and checks the typed onesOffOn

Production Settings > Posting accounts

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Work in progress / Applied labour / Applied machine cost / Applied overhead / Production variance / Abnormal scrap expense / Subcontract accrualقيد التصنيع / العمالة المحملة / تكلفة الآلات المحملة / المصاريف غير المباشرة المحملة / فروق الإنتاج / مصروف الهالك غير الطبيعي / مستحقات التعاقدText (account code)NoMax 20 each; empty = default 1250 / 5250 / 5255 / 5260 / 5310 / 5320 / 2150; with posting on each typed code must be a posting account(leave empty)'9999' with posting on -> 'Account 9999 is not a posting account.'

Subcontract Orders > New subcontract order

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Manufacturing orderأمر التصنيعSelect (open MO, first 200)ConditionalAn open order (not Completed / Closed / Cancelled); qty defaults to its remaining qtyMO-000130A completed order (API) -> 'The order is finished.'
...or the product (a new order is made)…أو المنتجSelect (product)ConditionalUsed when no MO is chosen: a new MO (source Subcontract) is createdOT-1000Neither MO nor product -> 'Choose the order or the product the vendor makes.'
QtyالكميةNumberNoMore than zero when given10-1 -> 'Must be more than zero.'
SubcontractorالمقاولSelect (partner)YesA company partnerTest Carpentry Subcontractor LLCEmpty -> 'Choose the subcontractor.'
ComponentsالمكوناتSelectNoWe send the components (lines made from the MO's stocked components x share) / The vendor supplies everything (no lines)We send the components'both' (API) -> 'Choose one of: We send the components, The vendor supplies everything.'
Service price per unitسعر الخدمة للوحدةMoney (AED)Conditional0 or more; must be > 0 before the purchase order is raised35.00-5 -> 'Must be at least 0.'
Due date / Notesتاريخ الاستحقاق / ملاحظاتDate / Text areaNoNotes max 300020/10/2026

Subcontract Orders > Receive

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Good Qtyالكمية السليمةNumberYesGood + rejected > 0 and at most outstandingOutstanding1012 of 10 -> 'At most 10 is outstanding.'
Rejected QtyالمرفوضNumberNo0 or more00
LotالدفعةTextNoLot of the finished goodsSUB-LOT-01

Shop Floor

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Scan MO, work order or work centerامسح الأمر أو أمر العمل أو المركزText (scanner)NoMax 60, upper-cased; WO number first, then MO number (its first Ready / In progress / Paused WO), then work-center codeWO-000002
Work Center / Operatorمركز العمل / المشغلSelectNoRemembered on this tablet (browser storage)ASM / EMP-0007

Shop Floor > Complete

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Good Qty / Rejected Qty / Lot (last operation)الكمية السليمة / المرفوضة / الدفعةNumber / TextNoLast operation receives the good qty into stock; any rejected qty is always sent to rework from this screenPlanned - good / 010 / 0

Shop Floor > Pause / Record Scrap

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Reason buttons / Qtyأسباب التوقف أو الهالك / الكميةButtons / NumberConditionalPause: a reason makes it downtime (else a pause). Scrap: reason required (Save disabled until one is chosen), qty > 0Qty 1BREAKDOWN / 1

Any report

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
From / Toمن / إلىDateNoTo not before From; default 1st of the month two months ago to today01/09/2026 - 30/09/2026To before From -> 'The period ends before it starts.'

Lot Traceability

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Lot or batch numberرقم الدفعةTextYesA lot of this companyLOT-TT-0925Unknown lot -> 'No such lot.'

MO > Documents

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
UploadرفعFileNoMax 15 MB; PNG, JPEG, GIF, WebP, PDF, DOCX, XLSX, PPTX, TXT, CSV (type read from the bytes)drawing.pdf 400 KB20 MB file -> 'A file can be at most 15 MB.'; an .exe renamed .pdf -> 'Upload a picture, a PDF, a Word, Excel or PowerPoint file, or a text or CSV file.'

MO > History

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Write a comment...اكتب تعليقًا…Text areaYesMax 2000; Post disabled while emptyCustomer called about deliverySpaces only (API) -> 'Write the comment.'

Applications > Manufacturing > Features

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
MRP and planned orders / Quality checks and non-conformance / Subcontracting / Scrap and rework / By-productsتخطيط المواد والأوامر المخططة / فحوص الجودة وعدم المطابقة / التصنيع لدى الغير / الهالك وإعادة التشغيل / المنتجات الثانويةOn / Off switch-Off: changes through the feature's routes are refused, its menus disappear, records stay readable. 'BOMs, routes and manufacturing orders' is always onOnPOST /manufacturing/mrp/run with MRP off -> 'MRP and planned orders is disabled for this company.' (capability_disabled)

Applications > Manufacturing > Fields

FieldArabic labelTypeRequiredRules and limitsDefaultExampleRefused when
Source reference / Manufacturing order project / Customer complaint reference / Non-conformance due dateمرجع المصدر / مشروع أمر التصنيع / مرجع شكوى العميل / تاريخ استحقاق عدم المطابقةNormal / Hidden / Required / Read-only-Hidden: box disappears and a value sent on a new record is refused; Required: the record is not saved without itNormalHidden Source reference and API sends one -> 'Source reference is turned off for this company.'